翻訳と辞書
Words near each other
・ Darlington Mechanics Institute
・ Darlington Memorial Cemetery
・ Darlington Memorial Fountain
・ Darlington Memorial Hospital
・ Darlington Mowden Park R.F.C.
・ Darlington Mowden Park Sharks
・ Darlington Nagbe
・ Darlington Nuclear Generating Station
・ Darlington Omodiagbe
・ Darlington Onyeri
・ Darlington Point
・ Darlington Power Station
・ Darlington Probation Station
・ Darlington Provincial Park
・ Darlington Raceway
Darlington rail crash
・ Darlington Railway Athletic F.C.
・ Darlington railway station
・ Darlington Record Club
・ Darlington Review
・ Darlington RFC
・ Darlington School
・ Darlington School of Maths and Science
・ Darlington Schoolhouse
・ Darlington Street Railroad Company
・ Darlington TMD
・ Darlington Township
・ Darlington Township, Beaver County, Pennsylvania
・ Darlington Township, Harvey County, Kansas
・ Darlington Township, South Dakota


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Darlington rail crash : ウィキペディア英語版
Darlington rail crash

The Darlington rail accident occurred on 28 June 1928 when a parcels train and an excursion train collided head on at Darlington Bank Top station. The accident was caused by the parcels train driver passing a signal at danger, due to misunderstanding the signalling layout in an unfamiliar part of the station. This accident resulted in the deaths of 25 people and the serious injury of 45 people.
==Events leading up to the collision==
On the night of 27 June 1928, LNER B16 Class No. 2369,〔Pringle p.3.〕 which formed part of the 9.30 pm up parcels train for York arrived at 10.45 pm – 11 minutes late. A short while after the station foreman instructed the signalman to allow the parcels train to move forward, beyond the scissors crossing at the south end of the platform. The engine moved forward to the south end of Platform 1 and waited. The shunter was then given instructions to take charge of the necessary shunting movements. During this time a train left No. 2 Bay line. The shunter passed instructions face-to-face with the driver whilst they waited for a fish train to pass. Once his signal was clear the shunter signalled the driver to start the movement. The shunter at this point riding on the last of the three carriage trucks, at this point the train had to move far enough forward to clear No. 53 points. Once these points were clear the signalman reversed the points and signalled to the shunter to begin the propelling movement. These movements were completed at approximately 11.02 pm. Whilst here, the shunter coupled up the necessary vehicles and connected the brakes. At 11.04pm the signalman in the Platform East signal box offered the parcels train to the signalman in the South Junction Signal Box.〔Pringle p.4.〕 The train was accepted "under caution". Up to this point all movements had been completed correctly and no errors had been made.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Darlington rail crash」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.